The Renewable Energy Reference Desk
Understand the language behind the projects. Find plain-English definitions, see how terms apply in practice, and go deeper with our 101 courses.
What it means
A battery setup where the battery has its own inverter and connects to the solar system on the AC side. It is the easiest way to add storage to an existing solar site, but energy is converted more times, so a little more is lost.
In practice
A building owner adds a 250 kW / 500 kWh battery with its own inverter next to a rooftop array that has been running for four years.
Also known as: AC coupling
Continue reading in Solar 101What it means
Using the same land for solar panels and farming, such as grazing sheep or growing crops under raised arrays. It can ease land-use concerns and help win local support, but design and O&M costs are usually higher.
In practice
A developer agrees to let a farmer graze sheep under a 5 MW array, which cuts mowing costs and helps the project through a county hearing.
Also known as: Dual-use solar
Continue reading in Solar Development 101What it means
The share of sunlight a surface reflects. It matters most for bifacial modules, which collect reflected light on their back side.
In practice
Snow cover raises albedo and gives the bifacial array a winter boost.
Also known as: Ground reflectance
Continue reading in PVsystWhat it means
A detailed land survey that meets national standards and shows boundaries, easements, improvements and title issues. Lenders and title insurers rely on it.
In practice
The ALTA survey shows a drainage easement through the planned array, which the engineer designs around.
Also known as: ALTA/NSPS survey
What it means
Services that help keep the grid stable, such as frequency regulation and reserves. Batteries are well suited to provide them.
In practice
A battery earns most of its first-year revenue from ancillary services.
Also known as: Grid services
Continue reading in Energy Markets 101What it means
A thin layer on the module glass that cuts down reflection so more sunlight reaches the cells. It adds a small amount of output and also reduces glare.
In practice
A module datasheet lists an anti-reflective coated glass front, which helps the glare study near a small airport.
Also known as: ARC
What it means
Drawings updated after construction to show what was actually installed. O&M teams and owners rely on them for the life of the project.
In practice
The turnover package includes as-built drawings showing the final cable routes.
Also known as: As-builts
Continue reading in Solar Engineering 101What it means
The work of looking after an operating project's technical, commercial and financial performance on behalf of its owner. The asset manager tracks output, contracts, billing, warranties, insurance and reporting so the project earns what the model promised.
In practice
An asset manager notices revenue is 6% below budget, traces it to a failed inverter, and files a warranty claim the same week.
Also known as: AM
Continue reading in Asset Management 101What it means
Adding battery capacity over time to make up for degradation and keep the promised energy capacity.
In practice
The owner plans augmentation in years 5 and 10 to maintain 400 MWh.
Also known as: Battery augmentation
What it means
The agency or official responsible for approving permits and inspections, such as a building department or fire marshal.
In practice
The AHJ requires a rapid shutdown label at the main panel.
Also known as: AHJ
What it means
The share of time a plant is able to produce power when the sun or wind is available. O&M contracts often guarantee it.
In practice
Availability falls to 97% after two inverters are down for a week.
Also known as: Plant availability
Continue reading in Asset Management 101What it means
The cost a utility saves by buying power from a project instead of making or buying it elsewhere. Under PURPA it sets the price for qualifying facilities.
In practice
A small project sells to the utility at its published avoided cost rate.
Also known as: PURPA rate
Continue reading in Energy Markets 101What it means
The compass direction that solar panels face. In the northern hemisphere, panels facing due south usually produce the most energy over a year.
In practice
A rooftop designer follows the building's 200 degree azimuth instead of rotating the racking, keeping the layout simple.
Also known as: Array azimuth
Continue reading in Solar 101What it means
Everything in a solar system other than the modules, such as racking, inverters, wiring, combiner boxes, transformers and monitoring. BOS is often split into electrical (EBOS) and structural parts and is a large share of project cost.
In practice
An EPC's bid breaks out modules, inverters and BOS separately so the developer can see where the price moved.
Also known as: BOS, EBOS
What it means
Racking held in place by weight, like concrete blocks, instead of anchors. It is common on flat roofs and landfills.
In practice
A landfill project uses ballasted racking to avoid piercing the cap.
Also known as: Ballasted mount
Continue reading in System ComponentsWhat it means
The risk that the price at a project's location differs from the price at the hub used in its contract. It can erode revenue under virtual PPAs and hedges.
In practice
A VPPA settles at the hub, but the project's node trades lower, so the owner loses on basis.
Continue reading in Energy Markets 101What it means
A system that stores electricity in batteries and releases it later, including the battery racks, inverters, controls and safety equipment. It lets a project shift energy to higher-value hours, cut peak demand or provide grid services.
In practice
A 100 MW / 400 MWh BESS charges from midday solar and discharges during the evening peak.
Also known as: BESS, Battery storage
Continue reading in Solar 101What it means
The electronics that monitor and protect battery cells, tracking voltage, temperature and state of charge.
In practice
The BMS takes a rack offline after detecting a cell over temperature.
Also known as: BMS
What it means
The tax rules for when a project counts as having started construction, which can lock in credit eligibility. For wind and solar under the 2025 law, the key deadline was July 4, 2026, and IRS Notice 2025-42 generally allows only the physical work test (starting significant on-site or off-site work); the 5% cost safe harbor survives only for solar of 1.5 MW AC or less. Projects must then keep construction moving continuously, with a four-year safe harbor.
In practice
The developer starts physical work on transformers to establish a begin construction date.
Also known as: Safe harbor
Continue reading in Solar Development 101What it means
A project that serves a customer's own load on their side of the utility meter, cutting what they buy from the grid. Value comes from bill savings rather than wholesale sales.
In practice
A rooftop system on a distribution center is behind the meter and offsets about 40% of the site's annual use.
Also known as: BTM, On-site
Continue reading in Solar Development 101What it means
A solar module that collects light on both its front and back. The extra output from the back depends on how reflective the ground is and how high the panels sit, so the gain varies by site.
In practice
A tracker project on light-colored gravel models a bifacial gain in PVsyst and asks the independent engineer to review the assumption.
Also known as: Bifacial module
What it means
Sending invoices to offtakers for energy, RECs or other services under the contracts.
In practice
The asset manager bills the PPA buyer monthly from revenue grade meter data.
Also known as: Invoicing
Continue reading in Asset Management 101What it means
The ability of a power plant to restart without power from the grid, so it can help bring the grid back after a blackout. Some battery systems are designed and paid to provide this service.
In practice
A utility contracts a battery near a substation to help re-energize local lines after a wide outage.
Also known as: Black start
Continue reading in Energy Markets 101What it means
A tax rule that lets owners deduct eligible equipment cost in the first year instead of over time. The 2025 law restored a permanent 100% first-year deduction for qualifying property acquired after January 19, 2025. Property bought under a binding contract signed before that date may still be limited to the old, lower rate.
In practice
The model takes bonus depreciation in year one to boost tax benefits.
What it means
Solar materials that are built into the building itself, such as solar roof tiles, facades or glass, instead of panels mounted on top. It costs more per watt but can replace normal building materials.
In practice
An architect specifies BIPV glass on a south facade, so the solar cost is partly offset by the cladding it replaces.
Also known as: BIPV
Continue reading in Types of SystemsWhat it means
Local approval to build a structure, confirming it meets building and fire codes. Rooftop and carport projects almost always need one.
In practice
The AHJ issues the building permit after reviewing structural calculations for the roof.
What it means
A small component in the module junction box that lets current go around a shaded or damaged group of cells. It limits power loss and helps prevent hot spots.
In practice
A chimney shades part of one module, and its bypass diodes keep the rest of the string producing.
What it means
Actual energy produced over a period divided by what the plant would make running at full nameplate power the whole time. It is a quick way to compare how hard different plants or sites work.
In practice
A 10 MWac solar farm that produced 21,900 MWh in a year had a capacity factor of 25%.
Also known as: CF, Net capacity factor
What it means
A market where grid operators pay resources to be available in future years. Payments depend on auction results and how much each resource is credited.
In practice
A battery clears the PJM capacity auction and earns a fixed payment per MW-day.
Also known as: Capacity auction
Continue reading in Energy Markets 101What it means
Revenue paid for being available to produce power, separate from payment for energy actually delivered.
In practice
The model shows capacity payments as a separate revenue line from energy sales.
What it means
A test that confirms the plant delivers the power the EPC guaranteed under measured conditions.
In practice
The plant passes its capacity test at 99.5% of expected output.
Also known as: Performance test
Continue reading in EPC Agreements 101What it means
The upfront cost to build a project, including equipment, construction, interconnection and soft costs. CapEx is usually shown in dollars per watt and is one of the biggest inputs to project returns.
In practice
A developer's budget shows CapEx of $1.45 per watt DC before interconnection upgrades are added.
Also known as: CapEx, CAPEX
Continue reading in Solar Development 101What it means
The mix of money that pays for a project, such as debt, tax equity and sponsor equity, and the order they get paid.
In practice
The capital stack is 40% tax equity, 45% debt and 15% sponsor equity.
Also known as: Cap stack
Continue reading in Project Finance 101What it means
The total greenhouse gases caused by an activity, product or organization, usually counted in tons of CO2 equivalent. Buyers of clean power often use it to set and report climate goals.
In practice
A retailer signs a PPA partly to reduce the carbon footprint it reports to investors.
Continue reading in Renewable Energy FundamentalsWhat it means
A large inverter, often several MW, that converts power from many strings at one location.
In practice
The utility-scale project uses four 4 MW central inverters on skids.
Continue reading in System ComponentsWhat it means
A formal change to an EPC contract's scope, price or schedule. Tracking them controls cost creep.
In practice
Unexpected rock leads to a change order adding $150,000 for pre-drilling.
Also known as: CO
What it means
A state rule that requires utilities to get a set share of electricity from clean sources, which can include nuclear or other non-renewable carbon-free power. It is similar to an RPS but usually broader in what counts.
In practice
A developer studies a state's CES targets to judge how much utility demand there will be for new projects.
Also known as: CES
Continue reading in Energy Markets 101What it means
A study approach where the grid operator reviews groups of projects together instead of one at a time, sharing upgrade costs among them.
In practice
Twenty projects in the same cluster share the cost of a new transmission line.
Also known as: Cluster process
What it means
An enclosure that joins several solar strings into one larger circuit before it goes to the inverter. It usually holds fuses and a disconnect for safety.
In practice
A crew lands 12 strings in each combiner box before running one larger feeder to the central inverter.
Also known as: Fused combiner
Continue reading in System ComponentsWhat it means
The date the project officially starts commercial operation, usually under its PPA. Many contracts and payments key off it.
In practice
COD is declared once PTO is granted and the PPA conditions are met.
Also known as: COD
Continue reading in Power Purchase Agreements (PPAs)What it means
Testing and verifying that every system works as designed before the project starts operating.
In practice
Commissioning includes IV curve tracing, inverter startup and SCADA checks.
Also known as: Cx
What it means
A list of tests and checks that must be completed and documented before a project can be turned over.
In practice
The commissioning checklist confirms every inverter passed startup tests.
What it means
A program that lets local governments buy power for residents and businesses instead of the utility doing it. CCAs often sign PPAs for renewables.
In practice
A CCA in California signs a 15-year PPA with a new solar plus storage project.
Also known as: CCA
Continue reading in Energy Markets 101What it means
A solar project whose power or bill credits are shared by many subscribers, such as households and small businesses, who could not install solar themselves. Rules, credit values and who can subscribe are set state by state.
In practice
A 5 MW community solar farm in New York signs 600 residential subscribers who each get a monthly bill credit.
Also known as: Shared solar, CSG
Continue reading in Solar Development 101What it means
A local approval that allows a use, like a solar farm, that is permitted in a zoning district only if certain conditions are met. It usually involves public hearings.
In practice
The planning board grants a CUP with conditions for screening, setbacks and a decommissioning bond.
Also known as: CUP, Special use permit, SUP
What it means
When transmission lines are full, so cheaper power cannot reach where it is needed and prices differ by location.
In practice
Congestion cuts the price at the project's node during sunny afternoons.
Also known as: Transmission congestion
Continue reading in Energy Markets 101What it means
Short-term debt that funds building the project and is repaid at completion by tax equity or term debt.
In practice
The construction loan is drawn monthly against EPC milestones.
What it means
Repairs made after something breaks. Response times are set in the O&M contract.
In practice
A tech replaces a blown fuse within the 24-hour corrective maintenance window.
Also known as: Reactive maintenance, CM
Continue reading in Asset Management 101What it means
Splitting project costs into tax categories, such as credit-eligible equipment versus land work, for credits and depreciation.
In practice
Cost segregation separates the fence and access road from credit-eligible equipment.
Also known as: Cost seg
What it means
How likely a buyer or partner is to pay what they owe over the life of a contract. Weak offtaker credit can make a project hard to finance or force extra security.
In practice
A lender asks for a parent guarantee because the PPA buyer is a small private company.
Also known as: Credit quality
Continue reading in Origination 101What it means
The sequence of tasks that sets the earliest finish date. A delay on any of them delays the whole project.
In practice
Transformer delivery is on the critical path, so a two-week delay moves COD.
Continue reading in Solar Construction SchedulesWhat it means
A study that checks a site for historic or archaeological resources that must be protected. It is often part of state or federal review.
In practice
The survey finds an old farmstead foundation, and the layout avoids it.
Also known as: Archaeological survey
What it means
When a project is told to reduce output, usually because of grid limits or very low prices. It lowers revenue unless the contract pays for it.
In practice
The plant is curtailed on spring afternoons when solar floods the grid.
Continue reading in Energy Markets 101What it means
The wind speed at which a turbine starts producing power.
In practice
With a 3 m/s cut-in speed, the turbines start spinning on light breezes.
What it means
The number of full charge and discharge cycles a battery can complete before its capacity falls to a set level, often 70% or 80% of new. It drives warranty terms and how often the battery can be used each day.
In practice
A battery warranty allows one full cycle per day for 15 years before augmentation is needed.
What it means
The monitoring system that collects data from meters, inverters and weather sensors for performance tracking.
In practice
The DAS flags a string inverter that stopped reporting overnight.
Also known as: DAS, Monitoring
Continue reading in System ComponentsWhat it means
The wholesale market where power is bought and sold for each hour of the next day. Most volume clears here.
In practice
The battery bids its evening discharge in the day-ahead market.
Also known as: DA market
Continue reading in Energy Markets 101What it means
The ratio of DC module capacity to AC inverter capacity. A higher ratio adds energy in low light but causes more clipping at midday.
In practice
A 7 MWdc array on 5 MWac of inverters has a DC/AC ratio of 1.4.
Also known as: ILR, Inverter loading ratio
What it means
A battery setup where the battery and solar share an inverter and connect on the DC side. It can capture energy that would be clipped and loses less in conversion, but it is harder to add to an existing site.
In practice
A new solar plus storage project sends clipped midday solar into a DC-coupled battery instead of losing it.
Also known as: DC coupling
What it means
A small device attached to each module that tunes its output before sending power to a string inverter. It reduces losses from shading or mismatch and gives module-level monitoring.
In practice
A rooftop with vents and HVAC units uses optimizers so shaded modules do not drag down the whole string.
Also known as: Power optimizer
Continue reading in System ComponentsWhat it means
Cash available for debt payments divided by the debt payments due. Lenders size loans so DSCR stays above a minimum.
In practice
The lender sizes debt at a 1.30x DSCR on P50 cash flows.
Also known as: DSCR
What it means
Working out how much a lender will loan based on cash flows, DSCR and other limits.
In practice
Debt sizing shows the project can support $12 million of term debt.
Continue reading in Project Finance 101What it means
Cutting carbon emissions from the power sector, buildings, transport and industry. For developers it shows up as demand from utilities and companies with climate targets.
In practice
A university's decarbonization plan leads it to request proposals for on-site solar and a long-term PPA.
Continue reading in Renewable Energy FundamentalsWhat it means
Removing a project at the end of its life and restoring the site. Many leases and permits require a plan and financial security for it.
In practice
The county requires a decommissioning bond before issuing the building permit.
Also known as: Decommissioning plan
What it means
How much a module's output declines each year as it ages, usually shown as a percentage. It is built into the financial model and backed by the manufacturer's warranty.
In practice
A model assumes 0.5% annual degradation, so year 10 output is about 95% of year one.
What it means
A part of a commercial electric bill based on the highest power the customer draws in a short window during the month, not on total energy used. Solar alone often does not cut it much, but batteries can.
In practice
A cold storage warehouse adds a battery to trim its monthly peak and lower its demand charges.
Continue reading in Origination 101What it means
Programs that pay customers to reduce or shift their electricity use when the grid is stressed. Batteries and flexible loads are well suited to it.
In practice
A school district enrolls its battery in a utility demand response program and earns payments for summer events.
Also known as: DR
Continue reading in Energy Markets 101What it means
The timetable for deducting a project's cost from taxable income over several years. Solar projects have used accelerated schedules, which make tax benefits a key part of project returns.
In practice
A tax equity model uses 5-year MACRS on eligible costs to size the investor's tax benefits.
Also known as: MACRS
What it means
How much of a battery's capacity is used in a cycle. Deeper cycles usually wear the battery faster.
In practice
Limiting DoD to 90% helps the battery meet its warranty life.
Also known as: DoD
What it means
The payment a developer earns for creating a project, often paid at financial close or on sale.
In practice
The buyer pays a developer fee of $0.10 per watt at NTP.
Also known as: Dev fee
What it means
The checkpoints a project passes as it moves from idea to construction, such as site control, interconnection, permits and financing.
In practice
The developer reviews each project at development milestones before spending more money.
Also known as: Stage gates
Continue reading in Solar Development 101What it means
The rate used to convert future cash flows to today's value, reflecting the time value of money and risk.
In practice
Raising the discount rate from 7% to 9% cuts the project NPV by a third.
What it means
Smaller power projects connected to the local distribution grid or at a customer's site, rather than large plants on the transmission system. Rooftop, carport and community solar are common examples.
In practice
A 2 MW ground mount connects to a 13.2 kV distribution line as a DG project.
Also known as: DG
Continue reading in Solar Development 101What it means
An extra federal tax credit amount for projects that use enough US-made steel, iron and manufactured parts.
In practice
The procurement team tracks module and tracker origin to support a domestic content claim.
Also known as: Domestic content adder
What it means
The review of a project's contracts, permits, technical design and finances by lenders, investors or buyers before they commit.
In practice
Lender due diligence finds a missing easement, which delays close by a month.
Also known as: DD
What it means
How long a battery can discharge at full power, equal to energy capacity divided by power capacity.
In practice
A 50 MW / 200 MWh battery has a 4-hour duration.
Also known as: Storage duration
What it means
A right to use part of someone else's land for a specific purpose, such as access roads or power lines. Projects often need easements to reach the grid.
In practice
The project secures a 50-foot easement across a neighbor's field for its collection line.
Also known as: Right of way
Continue reading in Site ControlWhat it means
The share of incoming sunlight a solar module or cell turns into electricity. Higher efficiency means more power from the same area, which matters most on tight roofs.
In practice
A roof with limited space uses 22% efficient modules to fit the customer's target system size.
Also known as: Module efficiency
Continue reading in Solar 101What it means
A way for tax-exempt groups, such as cities, schools and co-ops, to receive certain clean energy credits as a cash payment.
In practice
A school district uses elective pay to receive the value of its rooftop solar credit.
Also known as: Direct pay
Continue reading in Solar Development 101What it means
Local approval for electrical work that ensures it meets the electrical code. Inspections happen during and after installation.
In practice
The inspector signs off on the electrical permit after checking the AC disconnect and grounding.
What it means
Buying or storing energy when prices are low and selling or using it when prices are high. It is a main revenue stream for many batteries.
In practice
A Texas battery charges overnight at low prices and discharges into a high-priced evening hour.
Continue reading in Energy Markets 101What it means
An extra federal tax credit amount for projects in areas tied to fossil fuel jobs, brownfields or certain economic conditions.
In practice
An originator targets a former coal county because it may qualify for the energy community bonus.
Also known as: Energy community adder
Continue reading in Solar Development 101What it means
The software that decides when a battery charges and discharges to meet revenue or customer goals.
In practice
The EMS discharges ahead of the monthly peak to cut demand charges.
Also known as: EMS
What it means
A modeled estimate of how much energy a project will produce each year, based on weather, design and losses. It drives revenue in the financial model.
In practice
The independent engineer reviews the energy yield assessment and trims the P50 by 1%.
Also known as: Production estimate, EYA
Continue reading in Solar Engineering 101What it means
The licensed engineer who stamps the design drawings and takes professional responsibility for them.
In practice
The EOR stamps the structural drawings for the carport before the permit submission.
Also known as: EOR
Continue reading in Solar Engineering 101What it means
A contract where one contractor designs, buys equipment for and builds the project for a set price and schedule.
In practice
The developer signs a fixed-price EPC contract with guaranteed completion dates.
Also known as: EPC, Engineering, procurement and construction
Continue reading in EPC Agreements 101What it means
Measures like silt fence, seeding and basins that keep soil from washing off a construction site. They are required by permits and inspected often.
In practice
After grading, crews seed the site and add a sediment basin to meet the E&S plan.
Also known as: E&S, ESCP
What it means
A set annual increase in a contract price, such as a PPA rate or lease payment. Small changes in the escalator have a big effect on long-term value.
In practice
The PPA starts at $0.09 per kWh with a 2% escalator each year.
Also known as: Annual escalator
Continue reading in Power Purchase Agreements (PPAs)What it means
A signed statement from a counterparty confirming that a contract is in effect and no one is in default. Lenders and buyers ask for them at closing.
In practice
The landowner signs an estoppel confirming the lease is current before the project sale closes.
Also known as: Estoppel
What it means
A promise that the landowner or customer will not deal with other developers for a set time. It protects the developer's spending on early studies.
In practice
A 120-day exclusivity clause keeps the roof owner from signing with a competitor while the developer runs interconnection studies.
Also known as: Exclusivity period
Continue reading in Solar Development 101What it means
A filing with the Federal Aviation Administration for structures that might affect air navigation, such as tall equipment or projects near airports. Wind turbines almost always need it.
In practice
The wind developer files FAA notices for every turbine location.
Also known as: Form 7460-1
What it means
The final utility study that designs the required interconnection facilities and gives firmer cost and schedule estimates.
In practice
The facilities study firms the upgrade cost, and the interconnection agreement follows.
What it means
The price a project would sell for between a willing buyer and a willing seller. Tax credits are usually based on cost, but when a project changes hands, the price paid (and its FMV) can set the new owner's credit basis. An independent appraisal helps defend that value if the IRS questions it.
In practice
An appraisal supports the FMV used to calculate the ITC.
Also known as: FMV
What it means
An early utility study that gives a first look at whether a project can connect and roughly what upgrades it may need.
In practice
The feasibility study suggests a new breaker at the substation may be needed.
What it means
A long-term contract that pays a fixed price for each unit of renewable power a project delivers. It gives very predictable revenue and was used to start many early solar markets.
In practice
A small solar project signs a 20-year FiT with a municipal utility at a set price per kWh.
Also known as: FiT
What it means
Federal rules from 2025 that deny clean electricity credits to owners that are, or are controlled by, a 'prohibited foreign entity' (mainly tied to China, Russia, North Korea or Iran). Projects beginning construction after 2025 must also keep enough of their equipment cost from non-prohibited sources: at least 40% for generation and 55% for storage in 2026, rising each year. IRS Notice 2026-15 gives interim safe harbors, and more guidance is expected.
In practice
Procurement adds supply chain certifications to supplier contracts to address FEOC rules.
Also known as: Prohibited foreign entity (PFE), Foreign entity of concern
What it means
A 2023 federal rule that reformed interconnection on the transmission system, moving regions toward cluster studies and stricter readiness rules.
In practice
Grid operators rewrite their queue procedures to comply with FERC Order 2023.
Also known as: Order 2023
Continue reading in Energy Markets 101What it means
The milestone when all work, including punch list items and documents, is finished and retainage can be released.
In practice
Final completion is reached after the as-builts and warranties are delivered.
Also known as: FC
What it means
The point when all financing documents are signed and funds are available. It usually comes just before or at NTP.
In practice
Financial close happens two days before full NTP to the EPC.
What it means
Solar arrays mounted on floats on reservoirs, ponds or other water bodies. It saves land and can cut evaporation, but anchoring and electrical safety need special design.
In practice
A water utility installs floating solar on a treatment pond to power its pumps.
Also known as: FPV, Floatovoltaics
Continue reading in Solar Development 101What it means
Fast adjustments to power output to keep grid frequency at its target. Grid operators pay for it.
In practice
The battery follows a regulation signal every few seconds.
Also known as: Regulation
Continue reading in Energy Markets 101What it means
A project that connects directly to the grid and sells power to a utility or market, not to a single on-site customer. Community and utility-scale solar are FTM.
In practice
A 5 MW ground mount sells all output to the utility as a front-of-the-meter project.
Also known as: FTM, In-front-of-the-meter
Continue reading in Solar Development 101What it means
The power line that connects a project's substation to the utility's point of interconnection. The project usually builds and owns it.
In practice
A two-mile gen-tie connects the solar farm to the utility substation.
Also known as: Generation tie line
What it means
Testing of soil and rock to design foundations, piles and roads. Poor soils or shallow rock can raise construction costs.
In practice
The geotech report finds rock at 4 feet, so the racking switches to pre-drilled piles.
Also known as: Geotech
What it means
An analysis of whether reflected sunlight from panels could affect pilots, drivers or neighbors. Airports and the FAA may require it.
In practice
A project near a regional airport runs a glare study and adjusts tilt to avoid the approach path.
Also known as: Glint and glare study
What it means
The point where solar or other renewable power costs the same or less than power bought from the grid. Past that point, projects can make sense without subsidies.
In practice
A developer shows a customer that rooftop solar is at grid parity with their retail rate even before incentives.
Continue reading in Renewable Energy FundamentalsWhat it means
The grid's ability to keep voltage and frequency steady as supply and demand change. Inverter-based resources help or hurt it depending on how they are controlled.
In practice
Smart inverter settings help a feeder with lots of solar keep voltage within limits.
Continue reading in Renewable Energy FundamentalsWhat it means
A solar system connected to the utility grid, so it can export extra power and draw power when needed. Most commercial and utility projects are grid-tied.
In practice
A warehouse's grid-tied system exports surplus on weekends under net metering.
Also known as: Grid-connected
Continue reading in Types of SystemsWhat it means
The area covered by modules divided by the total ground area of the array. Higher GCR fits more capacity but adds row-to-row shading.
In practice
Moving from 0.35 to 0.40 GCR adds capacity but increases shading losses in winter.
Also known as: GCR
What it means
Equipment that detects current leaking to ground and shuts down the circuit to prevent fires and shocks. Inverters include it and codes require it.
In practice
An inverter trips on a ground fault after rain, and the O&M tech finds a damaged cable at a combiner.
Also known as: GFP, GFDI
Continue reading in System ComponentsWhat it means
A long-term contract to rent land for a project, usually covering construction, operations and removal. Rent, term, renewals and decommissioning are key terms.
In practice
A 35-year ground lease pays the farmer $1,000 per acre per year with a 2% escalator.
Also known as: Land lease
Continue reading in Solar Development 101What it means
Solar arrays installed on racking fixed to the ground rather than on a roof. They can be fixed tilt or tracking and range from small to utility scale.
In practice
A 3 MW community solar project uses fixed-tilt ground mount racking on a former hay field.
Also known as: Ground-mounted solar
Continue reading in Solar Development 101What it means
The latest date by which a project must reach COD under its contract, or face penalties or termination.
In practice
Missing the guaranteed COD would let the buyer collect delay damages under the PPA.
Also known as: GCOD
Continue reading in Power Purchase Agreements (PPAs)What it means
A utility map showing roughly how much new generation each part of the distribution grid can take without upgrades. It is a fast screening tool.
In practice
An originator screens 30 parcels against the hosting capacity map and keeps the five on strong feeders.
Also known as: Hosting capacity
What it means
A small area of a module that overheats, often from shading, cell cracks or bad connections. It can cut output and cause damage.
In practice
The IR scan shows a hot spot on a module with a cracked cell, and it is replaced.
What it means
The height of the turbine's rotor center above the ground. Taller hubs reach stronger wind but face more permitting limits.
In practice
Raising hub height from 90 to 110 meters boosts the energy estimate.
What it means
A project that combines two or more resources, most often solar and batteries, behind one interconnection. It can deliver power more steadily and capture more value than either alone.
In practice
A 50 MW solar plus 25 MW battery hybrid shares one point of interconnection.
Also known as: Solar plus storage
Continue reading in Solar 101What it means
The US standard for how distributed energy resources connect to and interact with the grid, including ride-through and smart inverter functions.
In practice
The utility requires inverters listed to UL 1741 SB for IEEE 1547-2018.
What it means
A third-party engineer hired by lenders or investors to review design, energy estimates, contracts and construction.
In practice
The IE signs off that substantial completion was achieved before the loan converts.
Also known as: IE
What it means
A company that owns power plants and sells electricity to utilities or other buyers, but is not itself a utility. Many renewable developers and owners are IPPs.
In practice
An IPP buys a late-stage solar project and signs a 20-year PPA with the local utility.
Also known as: IPP
Continue reading in Renewable Energy FundamentalsWhat it means
Using thermal cameras, often on drones, to find hot modules, connections or equipment that may be failing.
In practice
A drone IR scan finds 15 modules with hot spots across the site.
Also known as: IR scan, Thermal imaging
Continue reading in Asset Management 101What it means
The process and physical connection that lets a project deliver power to the grid. It includes applications, utility studies, upgrade costs and agreements, and it is often the biggest schedule risk in development.
In practice
A developer learns that interconnection will need a $900,000 line upgrade, which changes the project economics.
Also known as: IX
What it means
The contract between the project owner and the utility or grid operator that sets the terms for connecting and operating. It lists required upgrades, costs, milestones and technical rules.
In practice
After the facilities study, the developer signs an interconnection agreement and posts security for the upgrades.
Also known as: IA, GIA, ISA
What it means
The formal request to connect a project to the grid, with site control, design and a deposit. Filing it starts the study process.
In practice
The developer files the interconnection application with a $50,000 deposit and a preliminary SLD.
Also known as: IX application
What it means
The list of projects waiting for a utility or grid operator to study and approve their connection. Queues are long in many regions and drive development timelines.
In practice
The project enters the queue in March and expects study results in about 18 months.
Also known as: Queue
What it means
The fact that solar and wind output changes with weather and time of day. Grid operators manage it with forecasting, flexible plants and storage.
In practice
A cloud bank cuts a solar plant's output by half for 20 minutes, and a nearby battery fills the gap.
Also known as: Variability
Continue reading in Renewable Energy FundamentalsWhat it means
The discount rate at which a project's NPV equals zero. Investors compare it to their target return.
In practice
The sponsor targets a 9% after-tax unlevered IRR.
Also known as: IRR
Continue reading in Project Finance 101What it means
A nonprofit that works on clean energy rules, interconnection standards and workforce training. Its model rules shape many state interconnection policies.
In practice
A state commission uses IREC model interconnection procedures as a starting point for new rules.
Also known as: IREC
Continue reading in Energy Markets 101What it means
The device that changes DC power from solar panels or batteries into AC power the grid can use. It also handles grid protection, monitoring and controls.
In practice
A 5 MWac project uses 40 string inverters of 125 kW each.
What it means
Energy lost when the array produces more DC power than the inverter can convert, so output is capped. Some clipping is normal and planned.
In practice
On clear summer days the plant flatlines at 5 MW from noon to 2 pm due to clipping.
Also known as: Clipping loss
Continue reading in PVsystWhat it means
A federal tax credit equal to a percentage of a project's eligible cost, claimed when the project is placed in service (Section 48E for most projects starting after 2024). Under the 2025 law, wind and solar projects qualify only if construction began by July 4, 2026, or the project is placed in service by the end of 2027; storage is not subject to that cutoff. The credit's value depends on labor rules, bonus adders and foreign-sourcing limits, so confirm it for each project.
In practice
A developer models a base ITC and treats any adders as upside until counsel confirms eligibility.
Also known as: ITC, Section 48E, Section 48 (projects started before 2025)
Continue reading in Solar Development 101What it means
When a system keeps powering local loads while disconnected from the grid. It needs special equipment and controls, and normal grid-tied inverters must shut off during outages.
In practice
During a storm outage, a hospital microgrid switches to island mode and runs on solar and batteries.
Also known as: Islanding
Continue reading in Types of SystemsWhat it means
The final approved drawing set that crews build from. It follows the issued for permit set and earlier design stages.
In practice
The EPC cannot start installing racking until the IFC drawings are released.
Also known as: IFC drawings
Continue reading in Solar Engineering 101What it means
A test that measures the current and voltage of a string to spot problems like damaged modules or wiring faults.
In practice
IV curve tracing during commissioning finds two strings with a broken connector.
Also known as: IV curve
Continue reading in Asset Management 101What it means
The small sealed box on the back of a module where the cell wiring meets the output cables. It houses the bypass diodes.
In practice
An IR scan finds a hot junction box, and the module is swapped under warranty.
Also known as: J-box
What it means
A unit of power equal to 1,000 watts. It describes how much power a system can make or use at a moment, not total energy over time.
In practice
A small business has a 150 kW rooftop system.
Also known as: kW
Continue reading in Solar 101What it means
A unit of energy equal to using or producing 1 kW for one hour. Utility bills and most energy sales are priced per kWh.
In practice
A 150 kW system that runs at full power for one hour produces 150 kWh.
Also known as: kWh
Continue reading in Origination 101What it means
A short, usually non-binding document that sets out the main deal terms before a full contract is drafted. It often includes binding exclusivity and confidentiality.
In practice
A developer signs an LOI with a landowner covering rent, term and a 90-day exclusivity period.
Also known as: LOI
Continue reading in Site ControlWhat it means
The average cost to produce each unit of energy over a project's life, including build, operating and financing costs. It is a common way to compare technologies and projects.
In practice
A developer compares the LCOE of fixed tilt versus tracker designs before choosing racking.
Also known as: LCOE
What it means
A laser-based tool that measures wind speeds at many heights from the ground, often used with or instead of met towers.
In practice
A LiDAR unit supplements the met tower to measure wind at hub height.
What it means
A partial go-ahead that lets the EPC start some work, such as engineering or ordering long-lead equipment, before full NTP.
In practice
An LNTP lets the EPC order the transformer while financing closes.
Also known as: LNTP
What it means
Preset payments a contractor owes if it misses deadlines or performance targets. They replace arguing over actual losses.
In practice
The EPC owes delay LDs for each day past the guaranteed substantial completion date.
Also known as: LDs
Continue reading in Solar Legal 101What it means
A battery chemistry widely used in stationary storage because of its safety, cost and cycle life.
In practice
The project selects LFP cells for lower fire risk and longer life.
Also known as: LFP
What it means
A record of how a customer's electricity use changes through the day and year. It drives system sizing and whether storage makes sense.
In practice
An originator uses 12 months of interval data to build the load profile before proposing a system size.
Also known as: Load curve
Continue reading in Origination 101What it means
Moving electricity use from expensive hours to cheaper ones, often using batteries or flexible equipment. It lowers bills under time-of-use rates.
In practice
A factory charges a battery at night and runs off it during afternoon peak pricing.
Continue reading in Energy Markets 101What it means
The wholesale price of power at a specific grid location and time, including energy, congestion and losses.
In practice
The plant's node has a lower LMP than the hub because of local congestion.
Also known as: LMP, Nodal price
Continue reading in Energy Markets 101What it means
A safety procedure that locks and tags equipment de-energized so no one can turn it on while work is underway.
In practice
The tech applies LOTO at the inverter before opening the combiner.
Also known as: LOTO
What it means
Equipment with long delivery times, such as transformers, switchgear and trackers, that must be ordered early.
In practice
The transformer has a 60-week lead time, so it is ordered under LNTP.
Also known as: Long-lead items
What it means
The large transformer that raises project voltage to grid voltage. It often has very long lead times.
In practice
The developer orders the MPT 18 months before COD to protect the schedule.
Also known as: MPT, GSU
What it means
Money set aside to pay for big future repairs, like replacing inverters.
In practice
The lender requires a reserve funded each year for year 12 inverter replacement.
Also known as: MMRA, Inverter reserve
What it means
The combination of voltage and current at which a module or string makes the most power. It shifts with sunlight and temperature.
In practice
On a cold sunny morning, the array's MPP voltage rises, which the designer checks against inverter limits.
Also known as: MPP
What it means
Inverter electronics that keep adjusting to hold a string at its maximum power point. Inverters with more MPPTs handle mixed orientations and shading better.
In practice
A rooftop with east and west arrays puts each face on a separate MPPT input.
Also known as: MPPT
What it means
The milestone when equipment is installed and ready for testing but not yet fully commissioned.
In practice
Mechanical completion triggers the start of commissioning tests.
Also known as: MC
What it means
Voltage levels, roughly 1 kV to 35 kV, used for collection systems and distribution lines.
In practice
Inverter output is stepped up to 34.5 kV for the collection system.
Also known as: MV
Continue reading in Solar Engineering 101What it means
A unit of power equal to 1,000 kilowatts. Utility and community scale projects are usually described in MW, either AC or DC.
In practice
The project is 5 MWac and 7 MWdc, so the DC/AC ratio is 1.4.
Also known as: MW
Continue reading in Renewable Energy FundamentalsWhat it means
A unit of energy equal to 1,000 kWh. Wholesale prices and battery energy capacity are usually stated per MWh.
In practice
A 100 MW battery that runs for 4 hours stores 400 MWh.
Also known as: MWh
Continue reading in Energy Markets 101What it means
A short public record of a lease that is filed with the county so others know it exists, without revealing private terms. Lenders usually require it.
In practice
After signing, the developer records a memorandum of lease to protect its rights if the land is sold.
Also known as: MOL
Continue reading in Site ControlWhat it means
A solar project that sells power into the wholesale market at whatever the price is, without a long-term contract. It has more upside and more risk, and lenders treat it cautiously.
In practice
A Texas project sells half its output merchant and hedges the rest with a contract.
Also known as: Merchant project
What it means
The years after a project's contract ends when it sells power at market prices. Lenders give it little credit.
In practice
The model assumes a 10-year merchant tail after the 25-year PPA.
Also known as: Post-PPA revenue
What it means
A tower with instruments that measures wind speed and direction at a site to support the energy estimate.
In practice
The developer collects two years of met tower data before financing.
Also known as: Meteorological tower, Met mast
What it means
A local energy system with its own generation and controls that can run connected to the grid or on its own. Campuses, military bases and critical facilities use them for resilience.
In practice
A fire station microgrid pairs rooftop solar, a battery and a generator to stay powered in outages.
Continue reading in Types of SystemsWhat it means
A small inverter mounted under each module that converts power to AC right at the panel. It is common on homes and small roofs with shading or many orientations.
In practice
A church roof with dormers uses microinverters so each panel works independently.
Also known as: Micro
Continue reading in System ComponentsWhat it means
Payments to the EPC tied to completing defined steps, like delivery of equipment or mechanical completion.
In practice
The EPC gets 20% on module delivery and 30% at mechanical completion.
What it means
Washing modules to remove dirt and recover lost output.
In practice
The O&M provider cleans modules twice a year at the desert site.
Also known as: Panel washing
What it means
Lost energy when modules in a string do not perform the same, so the weakest one limits the others. It comes from shading, soiling, manufacturing spread or damage.
In practice
Mixing two module batches with different currents adds a small mismatch loss in the energy model.
Also known as: Mismatch loss
Continue reading in PVsystWhat it means
A monthly report to the owner on production, availability, issues, finances and actions.
In practice
The MOR explains that low production came from snow cover, not equipment failure.
Also known as: MOR
Continue reading in Asset Management 101What it means
The housing on top of a wind turbine tower that holds the gearbox, generator and controls.
In practice
Technicians climb to the nacelle for the annual gearbox inspection.
What it means
A federal law requiring environmental review of projects that need federal permits, funding or land. Reviews range from simple exclusions to full environmental impact statements. In 2025 the White House CEQ withdrew its NEPA rules, so each agency now uses its own procedures, and the Supreme Court's Seven County decision told courts to defer to agencies on how broad a review must be.
In practice
A project on federal land must complete NEPA review before construction.
Also known as: National Environmental Policy Act
What it means
A compensation rule where a customer is paid for exported solar at a set rate, often lower than the retail price they pay. It makes self-use and batteries more valuable than under classic net metering.
In practice
Under a state net billing rule, exports earn far less than retail, so the customer adds a battery.
Also known as: Net billing tariff
Continue reading in Solar Development 101What it means
A rule that lets one solar system's credits be applied across several meters owned by the same customer. It helps farms, schools and campuses with many accounts.
In practice
A farm uses NEM aggregation to apply credits from one barn array to five other meters.
Also known as: NEMA, Aggregate net metering
Continue reading in Solar Development 101What it means
A billing rule that credits customers for solar power they send to the grid, usually at or near the retail rate. Many states have changed or reduced it.
In practice
A homeowner's meter spins backward at midday, and credits offset their winter bills.
Also known as: NEM
Continue reading in Solar Development 101What it means
The value today of all a project's future cash flows, after discounting them for time and risk and subtracting the investment. A positive NPV means the project beats the required return.
In practice
At an 8% discount rate the project shows an NPV of $1.2 million, so it clears the investment committee.
Also known as: NPV
Continue reading in Project Finance 101What it means
Changes to the shared grid, like new lines or substation equipment, needed to connect a project safely. Costs can make or break a project.
In practice
The utility assigns $800,000 in network upgrades to the project.
What it means
The fire code standard for installing stationary energy storage, covering spacing, size limits and safety systems.
In practice
The battery layout follows NFPA 855 spacing as adopted by the local fire code.
What it means
The standard voltage rating used to describe a system or battery, such as 12 V or 480 V. Actual voltage moves around this value during operation.
In practice
The inverter connects to the building's 480 V nominal service.
Continue reading in Solar 101What it means
The formal instruction to the EPC to start full work. It usually follows financial close and permits.
In practice
Full NTP is issued on May 1 and the 9-month construction clock starts.
Also known as: NTP, FNTP
What it means
The contract that sets the O&M provider's scope, response times, pricing and guarantees.
In practice
The O&M agreement includes quarterly inspections and a 99% availability guarantee.
Also known as: O&M contract
Continue reading in O&M AgreementWhat it means
A power system that is not connected to the utility grid and relies on its own generation and batteries. It is used in remote places where a grid connection is too expensive.
In practice
A remote telecom tower runs on an off-grid solar and battery system.
Also known as: Standalone system
Continue reading in Types of SystemsWhat it means
Wind farms built in the ocean, where winds are stronger and steadier but costs and permitting are complex.
In practice
An offshore wind project secures a lease area and a state offtake contract.
What it means
The party that buys a project's power, RECs or capacity under a contract. Its credit quality is one of the first things lenders and investors check.
In practice
A county government is the offtaker for a 2 MW solar project under a 25-year PPA.
Also known as: Buyer
Continue reading in Origination 101What it means
The voltage a module makes in sunlight when nothing is connected. Designers use it, adjusted for cold weather, to make sure strings never exceed equipment voltage limits.
In practice
The designer limits strings to 26 modules so cold-morning Voc stays under 1,500 V.
Also known as: Voc
What it means
The ongoing costs of running a project, such as O&M, insurance, land lease, property tax and asset management. It reduces cash flow every year of operation.
In practice
A model assumes OpEx of $18 per kW per year with a 2% annual escalator.
Also known as: OpEx, OPEX
What it means
The day-to-day work that keeps a project running, including inspections, repairs, cleaning, vegetation control and monitoring. It is usually done by a contractor under an O&M agreement.
In practice
The O&M provider replaces a failed inverter fan within the 48-hour response time in its contract.
Also known as: Operations & Maintenance, O&M
Continue reading in O&M AgreementWhat it means
A contract that gives the developer the right, but not the duty, to lease or buy land later, for a small payment now. It locks up the site while diligence and interconnection move forward.
In practice
A developer pays $5,000 a year for a three-year option before deciding whether to sign the full lease.
Also known as: Option to lease
Continue reading in Site ControlWhat it means
Production estimates with a 50% or 90% chance of being exceeded in a year. Equity often uses P50; lenders size debt on P90 or P99.
In practice
Debt is sized on a P99 one-year case while equity returns use P50.
Also known as: P50, P90, P99
Continue reading in PVsystWhat it means
A tax equity structure where the investor gets most tax benefits until it hits a target return, then its share drops and the sponsor gets more.
In practice
The investor gets 99% of tax benefits until its target return, then flips to 5%.
Also known as: Flip
Continue reading in Project Finance 101What it means
How long it takes for savings or income to repay the upfront cost. It is easy to explain to customers but ignores value after payback and the time value of money.
In practice
A rooftop system for a car dealer has a 6 year simple payback.
Also known as: Simple payback
What it means
The highest level of electricity use in a period, for a customer or the whole grid. It drives demand charges, capacity costs and grid planning.
In practice
A summer heat wave pushes the utility's peak demand to a new record at 6 pm.
Also known as: Peak load
Continue reading in Origination 101What it means
Using a battery or other resource to cut a customer's highest demand and lower demand charges.
In practice
The battery shaves 300 kW off the factory's monthly peak.
What it means
The number of hours per day the sun would deliver 1,000 W per square meter if spread evenly. It is a quick way to estimate production at a site.
In practice
A site with 4.5 peak sun hours makes roughly 4.5 kWh per kW of panels on an average day before losses.
Also known as: PSH
Continue reading in Solar 101What it means
A promise that a project will produce a set amount of energy or reach a set performance level, with payments if it falls short. EPCs, O&M providers and PPA sellers may give them.
In practice
The O&M contract guarantees 99% availability and pays the owner for lost revenue below that.
Also known as: Production guarantee
Continue reading in Asset Management 101What it means
Actual energy produced divided by the energy expected from the sunlight that hit the array. It shows how well the system is working regardless of weather.
In practice
A month with low output but a normal PR tells the asset manager the cause was weather, not equipment.
Also known as: PR
What it means
The utility's written approval to start running the project and exporting power.
In practice
The project gets PTO two weeks after the witness test and begins earning revenue.
Also known as: PTO
What it means
A list of every permit a project needs, with the agency, timeline, cost and status. It keeps permitting on schedule.
In practice
The permitting matrix shows the stormwater permit is on the critical path for NTP.
Also known as: Permit matrix
What it means
A newer type of solar cell made from crystal materials that are cheap to make and can be very efficient. Long-term durability is still being proven, so it is mostly in research and pilot products.
In practice
A module maker tests perovskite on silicon tandem cells in a pilot line.
What it means
A desk and site review that looks for past contamination or environmental problems on a property. Lenders usually require it before closing.
In practice
The Phase I ESA flags an old fuel tank, so the developer orders a Phase II.
Also known as: Phase I Environmental Site Assessment
What it means
Sampling of soil or groundwater to confirm whether contamination found in a Phase I is real and how bad it is.
In practice
Soil samples near the old tank come back clean, clearing the site for construction.
Also known as: Phase II Environmental Site Assessment
What it means
The technology that turns sunlight directly into electricity using semiconductor cells. Solar panels are PV modules.
In practice
The project uses PV modules on single-axis trackers.
Also known as: PV
Continue reading in Solar 101What it means
An agreement to pay a set amount to a local government instead of normal property taxes.
In practice
The county agrees to a 20-year PILOT at a fixed amount per MW.
Also known as: Payment in lieu of taxes
What it means
The date a project is ready and available to operate for tax purposes. It sets when credits and depreciation begin.
In practice
Tax counsel confirms the placed in service date matches the commissioning records.
Also known as: PIS
What it means
The exact location where a project connects to the utility grid. It sets where metering and ownership change hands.
In practice
The POI is a new breaker position at the utility's 69 kV substation.
Also known as: POI
What it means
Power loss caused by voltage differences between cells and the module frame, often worse in heat and humidity.
In practice
Output drops at the end of strings, and testing confirms PID.
Also known as: PID
What it means
The inverter equipment that converts battery DC power to AC and back again.
In practice
The PCS is sized at 50 MW to match the interconnection limit.
Also known as: PCS
What it means
A chart showing how much power a wind turbine makes at each wind speed. It is used to estimate production and test turbine performance.
In practice
An owner tests a turbine against its warranted power curve after output drops.
What it means
The ratio of real power to total power in an AC system. Grid rules often set a required range for projects.
In practice
The utility sets a fixed power factor setting that slightly reduces real power export.
Also known as: PF
Continue reading in Solar 101What it means
A long-term contract where a buyer agrees to purchase power from a project at a set price. It is the main revenue contract that makes many projects financeable.
In practice
A school district signs a 20-year PPA at a fixed rate with a 2% escalator.
Also known as: PPA
Continue reading in Power Purchase Agreements (PPAs)What it means
A low-cost request to the utility for basic information about the grid near a site before filing a full application.
In practice
The pre-application report shows the feeder is near its limit, so the developer moves to another site.
Also known as: Pre-app
What it means
Labor rules that projects must meet to earn the full federal credit amount, covering wage rates and use of registered apprentices.
In practice
The EPC submits weekly payroll records to show prevailing wage compliance.
Also known as: PWA
Continue reading in Solar Development 101What it means
Scheduled maintenance done to prevent failures, such as inspections, torque checks and filter changes.
In practice
The PM plan includes annual IR scans and inverter servicing.
Also known as: PM
Continue reading in Asset Management 101What it means
A financial model projecting a project's revenue, costs and returns over its life.
In practice
The pro forma shows a 1.5% higher IRR with trackers instead of fixed tilt.
Also known as: Financial model
What it means
Buying major equipment and services for a project, including vendor selection, contracts, logistics and quality checks.
In practice
Procurement locks module pricing six months before delivery.
What it means
A federal tax credit paid for each unit of electricity a project produces during its first ten years of operation (Section 45Y for most projects starting after 2024). Wind and solar projects qualify only if construction began by July 4, 2026, or the project is placed in service by the end of 2027. It can beat the ITC at high-output sites, but labor rules and foreign-sourcing limits also affect its value.
In practice
A high-output wind farm elects the PTC because it produces more value than the ITC.
Also known as: PTC, Section 45, 45Y
Continue reading in Solar Development 101What it means
Local tax on the project's land and equipment, often one of the biggest operating costs.
In practice
Property tax is the second-largest operating cost after O&M in the model.
Continue reading in Asset Management 101What it means
A field test that pulls on driven piles to confirm they can hold the design loads. Results set pile depth and type.
In practice
Pull tests at 20 locations show piles need to go 2 feet deeper than planned.
Also known as: Pile load test
What it means
A list of small items still to fix or finish near the end of construction.
In practice
The punch list includes missing labels and a damaged fence post.
What it means
Widely used software for modeling solar energy production and losses. Banks and independent engineers expect a PVsyst report for most projects.
In practice
The bank's IE requests the PVsyst report and loss diagram with the financing package.
Continue reading in PVsystWhat it means
The checks that confirm work meets design and quality standards during construction.
In practice
QA/QC inspections catch loose module clamps before final torque checks.
Also known as: Quality assurance and quality control
Continue reading in Solar Construction Quality, Safety & CommissioningWhat it means
A small renewable or efficient power plant (up to 80 MW for renewables) that qualifies under the federal PURPA law. QFs can often require the local utility to buy their power at its avoided cost. In organized markets, however, utilities may be excused from buying from QFs larger than 5 MW.
In practice
An 80 MW solar project qualifies as a QF and gets a contract at avoided cost.
Also known as: QF, PURPA
Continue reading in Energy Markets 101What it means
A project's place in the interconnection queue, which affects study order and who pays for upgrades.
In practice
A developer buys a project mainly for its early queue position.
What it means
The metal structure that holds solar modules on a roof or the ground at the right angle. It must handle wind, snow and the site's soil or roof conditions.
In practice
A flat-roof project uses ballasted racking to avoid roof penetrations.
Also known as: Racking, Mounting system
Continue reading in System ComponentsWhat it means
Power that supports grid voltage but does no useful work. Utilities often require projects to supply or absorb it.
In practice
The interconnection agreement requires the plant to operate between 0.95 leading and lagging power factor.
Also known as: VAR
What it means
The wholesale market that balances supply and demand within the operating day, often in 5-minute intervals. Prices can swing widely.
In practice
A sudden plant outage spikes real-time prices and the battery discharges.
Also known as: RT market
Continue reading in Energy Markets 101What it means
In regulated markets a single utility owns generation and sells power at approved rates. In deregulated markets generation competes and customers may choose suppliers.
In practice
Ohio's retail choice lets a business shop for power, while Georgia's utility sets regulated rates.
Also known as: Vertically integrated, Retail choice
Continue reading in Energy Markets 101What it means
A tradable certificate that represents the environmental benefits of 1 MWh of renewable power. RECs can be sold separately from the electricity and are often a meaningful revenue stream.
In practice
A project sells its RECs to a utility to meet that utility's RPS obligation.
Also known as: REC, SREC
Continue reading in Asset Management 101What it means
A goal set by a government or company for how much energy will come from renewables by a certain date. Unlike an RPS, it may not be legally binding.
In practice
A city sets a renewable energy target and asks for proposals for local solar.
Also known as: RET
Continue reading in Renewable Energy FundamentalsWhat it means
A credit used in the US Renewable Fuel Standard to track biofuel production and use. It is a fuels market tool and rarely touches solar or storage projects.
In practice
A biogas facility earns RINs for fuel it supplies to vehicle fleets.
Also known as: RIN
What it means
A state law requiring utilities to get a set percentage of their power from renewables by a target date. It creates demand for RECs and new projects.
In practice
A state RPS raises its solar carve-out, which lifts SREC prices.
Also known as: RPS
Continue reading in Energy Markets 101What it means
Replacing old turbines or equipment with newer technology at an existing site to boost output and extend life.
In practice
A 2005 wind farm is repowered with larger turbines on the same pads.
What it means
A formal question from the contractor to clarify drawings or specs. Slow answers can delay work.
In practice
The EPC issues an RFI on a conflict between the civil and electrical drawings.
Also known as: RFI
What it means
Having enough generation available to meet peak demand with a safety margin. Projects can earn payments for providing it.
In practice
A 4-hour battery signs an RA contract with a California utility.
Also known as: RA, Capacity
Continue reading in Energy Markets 101What it means
A share of each payment, often 5% to 10%, held back until the project is complete.
In practice
The owner holds 5% retainage until final completion and punch list closeout.
Also known as: Retention
Continue reading in Solar Construction BudgetsWhat it means
The approval from a manufacturer to send back a failed part for repair or replacement.
In practice
The inverter maker issues an RMA and ships a replacement board.
Also known as: RMA
What it means
The total gain from an investment compared with its cost, shown as a percentage. It is simple but ignores timing, so investors also use IRR and NPV.
In practice
A customer's rooftop system shows a lifetime ROI of 180%.
Also known as: ROI
What it means
A high-accuracy meter that measures energy for billing and incentive payments.
In practice
REC production is reported from the revenue grade meter, not inverter data.
Also known as: RGM
Continue reading in System ComponentsWhat it means
Checking that payments received match energy delivered and contract terms.
In practice
Reconciliation finds the buyer used the wrong escalator for three months.
Continue reading in Asset Management 101What it means
A strip of land used for roads, pipelines or power lines, either owned or held by easement. Crossing public or utility rights of way needs permits.
In practice
The gen-tie needs a permit to cross the county road right of way.
Also known as: ROW
What it means
A review of a roof's age, condition, structure and electrical setup to see if it can host solar.
In practice
The roof assessment shows only 5 years of warranty left, so the owner replaces the roof first.
Also known as: Roof survey
What it means
A contract to rent roof space for a solar system, including access, roof repairs and what happens if the roof must be replaced. It must line up with the building's own leases and mortgage.
In practice
A rooftop lease requires the owner to give 60 days notice before any roof work so panels can be removed safely.
Also known as: Roof lease
Continue reading in Solar Development 101What it means
The width of the circle swept by the blades. Bigger rotors capture more energy, especially at low wind speeds.
In practice
The newer turbine model has a larger rotor diameter for the low-wind site.
What it means
The share of energy put into a battery that comes back out. The rest is lost as heat and to equipment.
In practice
With 85% RTE, a battery charged with 100 MWh delivers about 85 MWh.
Also known as: RTE
What it means
Independent organizations that run the wholesale power market and transmission grid in a region, such as PJM, ERCOT, CAISO and MISO.
In practice
The project sells into PJM, which runs the regional market and the interconnection queue.
Also known as: RTO, ISO
Continue reading in Energy Markets 101What it means
A structure where the developer sells the project to an investor and leases it back to operate it. The investor takes the tax benefits.
In practice
The developer closes a sale-leaseback at COD and pays rent to the investor for 20 years.
Also known as: SLB
What it means
The system that monitors and controls plant equipment remotely and lets the utility send commands.
In practice
The utility uses SCADA to curtail the plant during a grid event.
Also known as: Supervisory control and data acquisition
Continue reading in System ComponentsWhat it means
The document listing exactly what a contractor will and will not do. Gaps cause change orders.
In practice
The SOW makes the EPC responsible for utility coordination up to the POI.
Also known as: SOW
Continue reading in Solar Construction Contracts and ScopeWhat it means
Shorthand for the federal investment credit (Section 48, now Section 48E) and production credit (Section 45, now Section 45Y) for clean power; the older sections cover projects that began construction before 2025. Owners choose one or the other for each project. Wind and solar face a 2025-law cutoff: construction must have begun by July 4, 2026, or the project must be placed in service by the end of 2027.
In practice
A developer runs both credit cases in the model before choosing ITC or PTC.
Also known as: 48E, 45Y, ITC, PTC
What it means
The minimum distance a project must stay from property lines, roads, homes or other features under local rules. Setbacks can shrink the usable area a lot.
In practice
A 100-foot setback from neighboring homes cuts the array size from 6 MW to 5 MW.
What it means
A study of how trees, buildings, terrain or other rows will shade the array during the year and how much energy that costs.
In practice
A shading analysis shows a tree line costs 4% of output, so the developer negotiates clearing rights.
Continue reading in PVsystWhat it means
The flickering shadow from moving turbine blades on nearby homes. Local rules may limit hours of exposure.
In practice
The model shows shadow flicker at two homes, so turbines are curtailed at sunrise.
What it means
The current a module makes in sunlight when its terminals are shorted. Designers use it to size wires, fuses and inverter inputs.
In practice
The engineer sizes combiner fuses using module Isc times the code safety factor.
Also known as: Isc
What it means
The state office that reviews how projects might affect historic and cultural sites. Its sign-off may be needed for permits or federal approvals.
In practice
The developer submits the cultural survey to SHPO and gets a no-effect letter.
Also known as: State Historic Preservation Office
What it means
A simplified drawing of a project's electrical system showing major equipment and how it connects. Utilities, permit offices and engineers all use it.
In practice
The utility asks for an updated single-line diagram showing the new recloser.
Also known as: SLD, One-line
Continue reading in Solar Engineering 101What it means
The legal right to build and operate a project on a piece of land or roof, through a lease, option, easement or ownership. Utilities and investors want proof of it early.
In practice
The interconnection application asks for evidence of site control, so the developer submits a signed option.
Continue reading in Site ControlWhat it means
Practices that keep workers and visitors safe during construction and operation.
In practice
Site safety rules require arc flash PPE for anyone opening the switchgear.
Continue reading in Asset Management 101What it means
An inverter that can actively support the grid, for example by adjusting voltage, riding through disturbances or following utility commands. Many utilities now require these functions.
In practice
The utility requires smart inverter volt-var settings as a condition of interconnection.
Also known as: Advanced inverter
What it means
An agreement with the landowner's lender that the project can stay in place even if the lender forecloses on the property. Financiers usually require it for leased sites.
In practice
Before financing, the developer gets an SNDA from the bank that holds the warehouse mortgage.
Also known as: Subordination, Non-Disturbance and Attornment Agreement
What it means
Lost energy from dust, pollen, bird droppings or snow on modules. Cleaning is scheduled when the gain beats the cost.
In practice
A dry summer shows 4% soiling loss, so the owner orders a module wash.
Also known as: Soiling
Continue reading in PVsystWhat it means
The basic unit of a solar module that turns light into electricity. Cells are wired together and sealed behind glass to make a module.
In practice
A 144 half-cut cell module has its cells arranged in two halves to reduce losses.
Also known as: PV cell
Continue reading in Solar 101What it means
Energy from sunlight, used to make electricity with PV or to make heat. It is the fastest-growing source of new power in many markets.
In practice
A utility's resource plan adds more solar energy than any other source.
Continue reading in Solar 101What it means
A large ground-mounted solar installation that sells power to the grid or a buyer. The term usually means community or utility scale projects.
In practice
A 20 MW solar farm sells its output to a cooperative utility.
Also known as: Solar park
Continue reading in Solar Development 101What it means
The total solar energy that reaches a surface over time, usually in kWh per square meter per day or year. It is a key input for production estimates.
In practice
Annual insolation data from a weather file feeds the PVsyst model.
Also known as: Insolation
Continue reading in PVsystWhat it means
The power of sunlight hitting a surface at a moment, measured in watts per square meter. Plants measure it on site to judge performance.
In practice
A pyranometer reading of 950 W/m2 helps confirm the plant is producing as expected.
Also known as: GHI, POA
Continue reading in PVsystWhat it means
An arrangement where a customer pays a fixed monthly fee to use a solar system owned by someone else. The owner keeps tax benefits and handles maintenance.
In practice
A homeowner pays a fixed lease payment for 20 years and the leasing company maintains the system.
What it means
The share of a customer's annual electricity use that a solar system is expected to cover. It guides system sizing and net metering limits.
In practice
A proposal sizes the system for a 70% offset to stay within the utility's net metering cap.
Also known as: Offset
Continue reading in Solar Development 101What it means
A framed, sealed group of solar cells that makes DC power. Modules are rated in watts and are the main equipment purchase in a project.
In practice
The project buys 9,000 modules rated at 580 W each.
Also known as: Module, Panel
What it means
The range of light wavelengths from the sun, from ultraviolet to infrared. Different cell types capture different parts of it.
In practice
Researchers stack two cell types to capture more of the solar spectrum.
Continue reading in Solar 101What it means
The energy a system produces per unit of installed capacity, often kWh per kWp per year. It lets you compare sites of different sizes.
In practice
A site with a specific yield of 1,400 kWh/kWp outperforms another at 1,200.
Also known as: Specific yield
Continue reading in PVsystWhat it means
A table showing where a project's money comes from and what it pays for. Both sides must balance.
In practice
Sources and uses shows tax equity, debt and sponsor equity covering EPC, interconnection and fees.
Also known as: S&U
What it means
Replacement equipment kept on hand to cut downtime, such as modules, fuses and inverter boards.
In practice
Keeping a spare inverter on site saves two weeks of downtime.
Also known as: Spares inventory
Continue reading in Asset Management 101What it means
The cash the project owner invests, which is paid last and takes the most risk.
In practice
The sponsor contributes 15% of project cost and holds the long-term upside.
Also known as: Developer equity
What it means
How full a battery is, shown as a percentage of its usable capacity. Operators manage it to meet commitments and protect battery life.
In practice
The battery holds 90% SOC before the evening peak to be ready for a capacity call.
Also known as: SOC
What it means
A permit that covers stormwater runoff from construction, usually under the federal NPDES program run by the state.
In practice
The project files a notice of intent for stormwater coverage before clearing begins.
Also known as: NPDES construction permit
What it means
How modules are wired in series into strings and how strings connect to inverters. It must keep voltage and current within equipment limits in all weather.
In practice
The engineer sets 28 modules per string and 18 strings per inverter.
Also known as: Stringing
Continue reading in Solar 101What it means
A mid-size inverter that takes power from several strings of modules. It is the most common choice for commercial and many utility projects.
In practice
A 3 MWac carport project uses 24 string inverters mounted on the canopy columns.
Continue reading in System ComponentsWhat it means
An engineering check that a roof, carport or ground structure can carry the weight and wind loads of the solar system.
In practice
The structural analysis shows the roof needs reinforcing in two bays.
Also known as: Structural review
Continue reading in Solar Engineering 101What it means
A customer who signs up for a share of a community solar project and receives bill credits. Subscriber management is an ongoing cost.
In practice
The subscription manager replaces 40 subscribers who moved out of the area.
Also known as: Community solar subscriber
What it means
The milestone when the project is complete enough to operate as intended, with only minor items left. It often ends delay LDs.
In practice
The IE confirms substantial completion once the capacity test passes.
Also known as: SC
What it means
A facility with transformers and switching equipment that steps up voltage and connects the project to the grid.
In practice
The project substation steps 34.5 kV up to 138 kV.
Also known as: Project substation
What it means
A plan that shows how a construction site will control erosion and keep sediment out of waterways. Sites that disturb an acre or more generally need one.
In practice
The EPC posts the SWPPP on site and inspects silt fences after every major rain.
Also known as: Stormwater Pollution Prevention Plan
What it means
A detailed utility study of how a project would affect the grid, identifying needed upgrades and their rough costs.
In practice
The SIS identifies $1.2 million of network upgrades, so the developer reconsiders the project size.
Also known as: SIS
What it means
Investment from a company that can use a project's tax credits and depreciation, in exchange for a share of cash and tax benefits. It is a core part of many capital stacks.
In practice
A bank invests tax equity for most of the project's tax benefits and a small cash share.
Also known as: TE
What it means
How much a module's power or voltage changes for each degree of temperature change. Lower power coefficients mean less loss in hot weather.
In practice
A desert project picks modules with a better temperature coefficient to reduce summer losses.
What it means
Long-term debt repaid from project cash flows over many years. It may sit at the project or holding company level.
In practice
A 18-year term loan replaces the construction loan at COD.
Also known as: Back leverage
What it means
A summary of the key commercial terms of a financing, sale or contract that the parties use to negotiate the final documents. Most terms are non-binding.
In practice
A tax equity investor sends a term sheet with its pricing, flip date and conditions to close.
Continue reading in Solar Legal 101What it means
A chain reaction where a battery cell overheats and spreads heat to nearby cells, which can lead to fire.
In practice
Spacing and fire testing are used to show thermal runaway will not spread between enclosures.
What it means
When a company other than the site owner owns the solar system and sells its power or leases it to the customer. It lets customers go solar with no upfront cost.
In practice
A nonprofit hospital uses TPO through a PPA so the owner can use the tax credits.
Also known as: TPO
What it means
A label for module makers judged bankable by a widely used industry ranking. It speaks to financial strength, not product quality.
In practice
The lender requires Tier 1 modules in the EPC contract.
Also known as: Tier 1
What it means
The angle of the modules from horizontal. Designers balance energy, row spacing, wind load and snow shedding when picking it.
In practice
A flat roof uses a 10 degree tilt to fit more rows and reduce wind loads.
Also known as: Tilt
What it means
A utility rate where the price of electricity changes by time of day and season. It rewards using or storing energy for high-price hours.
In practice
Under a TOU rate, a battery charged from midday solar saves more by discharging from 4 to 9 pm.
Also known as: TOU
Continue reading in Energy Markets 101What it means
A report from a title company showing who owns the land and what liens, easements or restrictions affect it. It is reviewed alongside the survey before financing.
In practice
The title commitment reveals an old pipeline easement, so the layout is shifted.
Also known as: Title report
Continue reading in Site ControlWhat it means
Racking that rotates modules to follow the sun during the day, adding energy compared with fixed tilt. Single-axis trackers are standard on many utility projects.
In practice
A Texas project picks single-axis trackers for about 15 to 20% more energy than fixed tilt in the model.
Also known as: Single-axis tracker, SAT
Continue reading in System ComponentsWhat it means
The option to sell federal clean energy tax credits to an unrelated buyer for cash. It simplifies financing for owners without tax appetite.
In practice
The sponsor sells its ITC to a corporate buyer at a discount to face value.
Also known as: Tax credit transfer
What it means
The documents the EPC hands to the owner at the end of construction, such as as-builts, manuals, warranties and test reports.
In practice
The O&M team uses the turnover package to set up its maintenance plan.
Also known as: Handover package
Continue reading in Solar Construction Project HandoffWhat it means
A weather data set that represents typical conditions at a site, built from many years of history. It is the standard input for energy models.
In practice
The designer loads a TMY file from a nearby station into PVsyst.
Also known as: TMY
Continue reading in PVsystWhat it means
Safety standards for PV modules covering electrical and fire safety. UL 61730 has replaced UL 1703 for new listings, so check which applies to your equipment.
In practice
The AHJ asks for proof that the modules are listed to UL 61730.
Also known as: UL 61730
What it means
Safety standards for energy storage systems. UL 9540 certifies the system, and UL 9540A tests how fire spreads.
In practice
The fire marshal asks for UL 9540A test results before approving the battery layout.
Also known as: UL 9540A
What it means
Large solar projects, often 20 MW and up, that sell power to utilities or the wholesale market and connect to transmission or high voltage lines.
In practice
A 200 MW utility-scale project connects to a 230 kV substation.
Also known as: Utility solar
Continue reading in Solar Development 101What it means
The approved price list and rules a utility uses to bill customers or pay generators. Tariffs set the savings or revenue a project can earn.
In practice
An originator reviews the customer's commercial tariff to see how much of the bill is demand charges.
Also known as: Rate schedule
Continue reading in Solar Development 101What it means
Controlling grass and weeds at a site so they do not shade panels, create fire risk or block access.
In practice
The site switches from mowing to sheep grazing to cut vegetation costs.
Also known as: Mowing
Continue reading in Asset Management 101What it means
Many small energy resources, such as home batteries and smart thermostats, controlled together to act like one power plant. It can supply capacity or grid services.
In practice
A utility pays 5,000 homeowners to let it dispatch their batteries as a VPP during heat waves.
Also known as: VPP
Continue reading in Energy Markets 101What it means
A financial contract where a buyer and project settle the difference between a fixed price and the market price, without the buyer taking physical power. Corporations use it to claim RECs from distant projects.
In practice
A tech company signs a VPPA with a Texas solar farm and receives the RECs while settling against the hub price.
Also known as: VPPA, Financial PPA, Contract for differences
Continue reading in Power Purchase Agreements (PPAs)What it means
Energy lost when turbines downwind sit in the slower, turbulent air left by upwind turbines.
In practice
The layout spaces turbines farther apart to reduce wake losses.
Also known as: Wake effect
What it means
A request to an equipment maker to repair or replace failed equipment under its warranty.
In practice
The asset manager files a warranty claim for 30 modules with cracked glass.
Continue reading in Asset Management 101What it means
The watt is the basic unit of power, and a kilowatt is 1,000 watts. Module ratings are in watts and system sizes are in kW or MW.
In practice
A 400 W module is 0.4 kW, so 250 of them make a 100 kW system.
Also known as: W, kW
Continue reading in Solar 101What it means
Comparing actual output to what the plant should have made given the real weather, to separate equipment problems from weather.
In practice
Weather-adjusted performance shows the plant at 98% of expected despite low production.
Also known as: Expected vs actual
What it means
The blended cost of all the money funding a project, weighted by each source's share. It is often used as the discount rate.
In practice
The model uses a 7.5% WACC to value the portfolio.
Also known as: WACC
What it means
A field study that maps where wetlands are on a site so the project can avoid them or get permits. Wetland impacts can add months of permitting.
In practice
The wetland delineation shrinks the buildable area by 8 acres.
What it means
A permit needed to fill or disturb wetlands or waters, often from the Army Corps of Engineers under the Clean Water Act.
In practice
A road crossing a small stream needs a wetland permit.
Also known as: Section 404 permit
What it means
A machine that turns wind into electricity using a rotor, gearbox or direct drive generator and a tower.
In practice
The project installs 30 turbines rated at 4.5 MW each.
Also known as: WTG
What it means
A test of the project's protection and controls observed by the utility before it allows full operation.
In practice
The utility witnesses the trip test on the recloser before granting PTO.
What it means
Local rules that set what can be built where. Projects may be allowed by right, need a special permit, or be banned in a zoning district.
In practice
The parcel is zoned agricultural, so the developer applies for a conditional use permit.
Also known as: Land use approval
Try a different spelling or acronym, choose another discipline, or clear your filters.
Help us build a more useful industry reference.